Two-Horizon Deterministic and Probabilistic Screening of Upstream Oil and Gas Pressure Assets under Corrosion-Driven Wall Loss

Authors

  • Amanze Gregory Onwuzurike Department of Mechanical Engineering, College of Engineering and Technology, Federal, University of Petroleum Resources, Effurun, Delta State, Nigeria Author https://orcid.org/0009-0002-9381-5876
  • Izelu Christopher Department of Mechanical Engineering, College of Engineering and Technology, Federal, University of Petroleum Resources, Effurun, Delta State, Nigeria Author
  • John Alabo Michael Department of Mechanical Engineering, College of Engineering and Technology, Federal, University of Petroleum Resources, Effurun, Delta State, Nigeria Author https://orcid.org/0009-0005-9059-7692
  • Frank Ihinosen Amedu Department of Mechanical Engineering, College of Engineering and Technology, Federal, University of Petroleum Resources, Effurun, Delta State, Nigeria Author

Abstract

Corrosion-induced wall loss can substantially reduce the pressure-containment capability of equipment, underscoring the importance of reliable screening for upstream oil and gas assets. However, comparing mechanics-based screening conditions across different pressure assets is challenging, particularly when wall-thickness limits, stress utilisation, and uncertainty must be considered over common future horizons. In this paper, we assess six numerical pressure-asset cases using a deterministic and probabilistic screening framework across two future horizons. The cases comprise a crude-oil pipeline (A1), a gas pipeline (A2), a multiphase flowline (A3), a pressure-separator shell (A4), a compressor-discharge line (A5), and an offshore export pipeline (A6). Remaining wall thickness and mean-diameter hoop-stress utilisation are calculated at the baseline (initial) state and at five- and ten-year horizons. The joint probability of satisfying both minimum wall-thickness and hoop-stress criteria is then estimated using 1,000,000 Monte Carlo realisations per asset, accounting for uncertainties in operating pressure, allowable material resistance, initial wall thickness, and corrosion rate. Estimated ten-year screening reliabilities for assets A1 through A6 are 0.9328, 0.0308, 0.0029, 0.8165, 0.0061, and 0.0049, respectively. An initial stress-limit exceedance is identified for A6 (utilization = 1.008), while the wall thickness of A3 is projected to fall below its specified minimum at ten years. Lowering the joint-efficiency factor for separator A4 from 1.00 to 0.85 reduces its ten-year screening reliability from 0.8165 to 0.1205. The analysis demonstrates that thickness and stress limit states can flag different screening concerns and that relative asset rankings can shift depending on the assessment horizon. This methodology provides an initial basis for prioritizing assets that warrant detailed, component-specific integrity assessment.

Keywords:

Corrosion Wall Loss, Pipeline Integrity, Pressure Vessels, Screening Reliability, Monte Carlo Simulation, Inspection Planning

Downloads

Download data is not yet available.

Downloads

ACCESSES

DOI: 10.70382/ajsede.v13i5.051
Views: 9  
Downloads: 7  

Published

23-11-2026

Issue

Section

Articles

How to Cite

Amanze, G. O., Izelu, C., Michael, J. A., & Frank, I. A. (2026). Two-Horizon Deterministic and Probabilistic Screening of Upstream Oil and Gas Pressure Assets under Corrosion-Driven Wall Loss. Journal of Systematic, Evaluation and Diversity Engineering, 13(5). https://doi.org/10.70382/ajsede.v13i5.051

Share

PlumX